This is the height of the hog panel we used. The top rail board was installed 60″ above the footer board. We installed our footer boards level and about 9″ from the ground. Measure the distance between each post and cut the 2×4 boards to length. Once all of the posts are installed and the concrete has cured, install the footer and top rail boards. Install Footer and Top Rail A 2×4 rail was placed at the lower edge of the 4×4 post and then another post was placed 5 feet about the lower board. Pro tip: To keep the posts in a straight line, run a string from end to end for each side of the deer fence.Īlign each post with the string. Then secure each post in place with concrete. Using a post hole digger, we dug 2 feet deep holes for each post. Install Posts 4×4 pressure treated posts were secured in place with cement. It was considerable cheaper than the big box home improvement stores. However, we purchased the hog wire panel was purchased from Tractor Supply Co. Most of these materials we picked up at our local Home Depot. We determined we would like 2 gates for our deer fence, one to enter from the backyard and one from the front yard.Įach section of fence will require 6 – 2×4 boards one for the footer, one for the top rail and the other 4 will be ripped down to enclose the 4 sides of the hog panels. Plan post layout and determine how many posts you will need. The first step is to plan how many linear feet of deer fencing you will need.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |